Rack And Pinion Construction Elevator Lift - MP-B17, B18 L
-
Payment
-
Origin
China Mainland
-
Minimum Order
1
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
Rack and Pinion Construction Elevator Lift - MP-B17, B18 L
Overview
The structure of this construction elevator is optimized and made of Q345 steel. Its cabin wall is made of galvanised cool roll steel plates.
The hoist is solid and strong, it runs smoothly and stable with full load of 3.2 tons.
Features
The Rack and Pinion Elevator Heavy Duty of 3 doors cabin for the builders to transport extremly heavy and big size materials, with the side door for forklifts to load/dischage materials.
The cage roof is totally weld at the edge, no worry about water leakage in raining season.
Production Details
Parts of the hoist are made by CNC machine, welded by robots. Steel spare parts are fine diecast.
Advantage
modularized design and accurated process, therefore, it is easy to assemble and install.
Low energy consumption and low cost of ownership.
Technical Data - Rack and Pinion MP-B17, B18 L
Payload | 3,200 kg |
Speed | 0–46 m/min. |
Max. Lifting Height | 450 m |
Cage Width (internal) | 1.6 m |
Cage Length (internal) | 4.0 m |
Cage Height (internal) | 2.9 m |
Cage Doors | Entrance Door + Exit Door + Side Door |
Motor Control | FC Control |
Engine Power per Cage | 3x15 kw |
Gearbox | KANGBO Helical Reducer |
Safety Device Type | Centrifugal Brake |
Power Supply Range | 380–500 V, 50 or 60 Hz, 3 phase |
Type of Mast | Square Column 650*650 mm with Bolted Rack |
Length Mast Section | 1.508 m |
Rack Module | 8 |
Construction Hoist Floor Selection System Features - KANGBO Multi-function Electric Control System
1, Automatic operation by button input or manual operation by control lever in the car.
2, Manual operation on cage roof.
3, The hoist will slow down automatically at ground floor in the case of manual operating.
4, Provides automatic functions such as equipment status display, error detect, repairing and commissioning.
5, Automatic landing at the selected floor.
6, Industrial PLC centralized control system.
7, Centralized handheld remote control system of automatic storey selection and operation is available according to request.
With this system, the hoist can achieve continuous operation, automatic landing, no need manual control, easy operation, to reduce labor intensity.
- Builders Pinion Rack Hoist Man Material - MP-B19, B20 L 5 Pieces / (Min. Order)
- Rack Elevator Heavy Load Builders Hoist SC300/300 - MP-B15, B16 L 5 Pieces / (Min. Order)
- Hoist Safety Device 5 Pieces / (Min. Order)
- Builders Pinion Rack Hoist Man Material - MP-B19, B20 L 5 Pieces / (Min. Order)
- Rack Elevator Heavy Load Builders Hoist SC300/300 - MP-B15, B16 L 5 Pieces / (Min. Order)
- 25mm² Sliding Contact Composite Power N Control Line Hoist Cable 1 Pieces / (Min. Order)
- 0-80M VFD Pinion and Rack Outdoor Hoist Lifts with Gear Reducer 1 Pieces / (Min. Order)
- 0-60M/Min High Speed Rack Pinion VFC Control Lift Hoists 1 Pieces / (Min. Order)
- 0-60M 2 ton VFD Rack Temporary Construction Elevators Hoist Lift 1 Pieces / (Min. Order)
- 0-46m SC200200 Rack Pinion Builder Temporary Elevator Hoist Lift 1 Pieces / (Min. Order)
- 0-34m Gear Rack Building Material Hoist Lifts 1 Pieces / (Min. Order)
- 0-54m 1 ton Outdoor Rack Pinion Construction Hoist Elevator Lift 1 Pieces / (Min. Order)